1- BARD-E-ASBI PUMP STATION PROJECT 

     Project Title:

 Implementation of Bard-e-Asbi oil pump station on EPC basis, on Tang Fanni /Afrineh / Kermanshah pipeline.

    Project Description:

Bard-e-Asbi pump station shall be constructed on Tange fanni/Afrineh/Kermanshah 16” pipeline to increase the throughput between Tange-Fanni and Kermanshah to 120,000 B.P.S.D. The main pumps will operate on a 2+1 series configuration, driven by variable speed drive electromotor. The pump station will be equipped with all the safety systems and its main buildings include the control building, emergency generator building, guardhouse and guesthouse.
 

 

    Client:

 National Iranian oil Engineering and Construction Company.

    Contract type:

       Lump sum

    Location:

       Lorestan province

    Engineering Price: 

       3/800/000/000 Rials

    EPC Price:

                    3.900.000   US $